We start with a view of a fully tiled roof over the bedrooms.
And from the inside...
The roof of the lift shaft — the highest point of the whole building — was made inside before being re-assembled outside.
Here is Father Daniel blessing the whole building from its highest point.
We have quite a good idea of what the finished building will look like from the outside now. Here are a couple of views of the side:
And one of the back:
The old fire escape staircase to the first floor has been temporarily removed while the new window and door frames are built. Before:
After:
...and from the inside:
Finally, the steel supports of the library gallery arrived last week:
And are already in place!