New Building: Weeks 32, 33 and 34 - Reaching the top

We start with a view of a fully tiled roof over the bedrooms.

And from the inside...

The roof of the lift shaft — the highest point of the whole building — was made inside before being re-assembled outside.

Here is Father Daniel blessing the whole building from its highest point.

We have quite a good idea of what the finished building will look like from the outside now. Here are a couple of views of the side:

And one of the back:

The old fire escape staircase to the first floor has been temporarily removed while the new window and door frames are built. Before:

After:

...and from the inside:

Finally, the steel supports of the library gallery arrived last week: