The ceiling has been put in on the first floor bedrooms.
Here is a view standing inside one of the new rooms.
And here's the view through the window.
On the top floor of the Parish centre, in the corner of the future library, there is a hole.
Here's what you'd see if you were to look down it:
You can see all the way down to the ground floor, and beyond:
This hole is the lift shaft, which will provide access to the library and to the accommodation block.
In the next picture, you will see a now familiar view of the former site of the staircase. If we climb that ladder...
...we come to a new doorway...
...and bedrooms 1 and 2 of the new building. The concrete blocks are at their full height...
...we're just waiting for the bricks to catch up on the outside!
The new building has now reached the first floor!
Here is the ceiling of the new parish office, bar and kitchen on the ground floor:
Standing at the bar and looking south, you can see the door and window of the new office:
And from the window, you can see where the bar will go:
Fr Daniel has been to inspect the site. Here he is standing in the new office:
Fr Dominic has been checking up on things too!
The steels have been put in the ground floor ceiling of the old parish centre — they will take the weight of the books in the new library.
And finally, the boiler house walls are slowly rising.
“And the people in prayer besought the Lord the most High, until the worship of the Lord was perfected, and they had finished their office.”
—Sirach 50:21
Above you can see the outer wall of the new Parish office. The wooden frames show where the window and door will be.
A couple of shots of the inside.
The window in this wall is very important — it will light the bar!
And the spaces have been made ready for the steel bars that will support the weight of the new library. The steel bars will arrive soon.