New Building: Weeks 51-52

The trench for the new drains, water pipes and cables has now crossed the courtyard. Here you can see it growing:

The scaffolding has come down in the library, giving a better idea of what the gallery looks like, and making the whole room feel much bigger.

Plastering of the walls and ceilings continues:

The bathrooms are tiled:

And the floor of the top bedroom is in place: